Advertisement

HindustanTimes Mon,21 Apr 2014

Good news for commuters: Kurla bridge reopened

HT Correspondent, Hindustan Times  Mumbai, February 14, 2013
First Published: 01:41 IST(14/2/2013) | Last Updated: 01:42 IST(14/2/2013)

In a respite from traffic snarls for more than 50,000 commuters, the Mumbai Metropolitan Region Development Authority (MMRDA) on Wednesday opened the Halav Bridge in Kurla to motorists.

Advertisement

The Halav Bridge is a part of the Old Agra Road and runs perpendicular to the CST road, which connects Kalina junction to the Kurla Depot.

The new bridge is 45-metre long and 11-metre wide. Earlier, motorists on the Old Agra Road had to exit to the CST road to go ahead, as the connecting Halav Bridge had been demolished. This created traffic jams on the portion of the CST road that runs under the bridge.

The Halav Bridge was originally 12-metre in length, but had to be demolished in 2011 for the widening of the CST road
as part of the Santacruz-Chembur Link Road (SCLR) project.

“We have now opened the bridge to commuters. Now, there will be no issue of traffic congestion under the bridge, since commuters using the Old Agra road will not have to use the CST road.  

Interestingly, the reopening of the bridge was a low-key event.

“It is welcome move by the MMRDA to open the bridge immediately after its completion, without much fanfare,” said RTI activist Anil Galgali.

MMRDA has spent Rs. 9.51 cr-ore for construction of the bridge.

Advertisement
more from Mumbai

India's first double-decker flyover opens in Mumbai

Motorists hoping to save time while taking the Santacruz Chembur Link Road (SCLR), which was opened to public on Friday, would have to crawl through certain sections as the traffic police have imposed a speed limit of 30kmph on the bridges, along with some other restrictions to ensure smooth flow of traffic.
Advertisement
Most Popular
Advertisement
Copyright © 2014 HT Media Limited. All Rights Reserved