Advertisement

HindustanTimes Sat,23 Aug 2014

Punjab to revamp 66 KV network for power supply

PTI  Chandigarh, June 05, 2014
First Published: 17:11 IST(5/6/2014) | Last Updated: 17:12 IST(5/6/2014)

 
The Punjab State PowerCorporation Limited (PSPCL) has approved a comprehensive plan to extend and increase the capacity of the existing 66 KV network in the state with a view to provide uninterrupted and continuous power supply to the consumers.
 
This whole exercise would entail financial outlay of Rs. and extended, an official spokesperson said here.
 
He said this process was aimed at the better management and distribution of uninterrupted power to the citizen of the state.

Advertisement
comment Note: By posting your comments here you agree to the terms and conditions of www.hindustantimes.com
blog comments powered by Disqus

Advertisement
more from Chandigarh

Bison's watering hole

Once upon a time, the tricity's most sought after watering hole at the Chandigarh Golf Club bore a strong character and historical profile. Pictures of legendary players had adorned the walls. A massive Indian bison head mounted at a prime location of the bar's walls complemented the pictures and presided over the cheery spirit of the late evenings. The pictures depicted the sport's great icons playing varied shots from beautiful locales across the world. Vikram Jit Singh
Advertisement

 
Advertisement
Copyright © 2014 HT Media Limited. All Rights Reserved