Advertisement

HindustanTimes Sun,31 Aug 2014

MC fails to auction multi-level parking

HT Live Correspondent, Hindustan Times  Ludhiana, April 25, 2013
First Published: 20:01 IST(25/4/2013) | Last Updated: 20:05 IST(25/4/2013)

Already running behind the schedule for auctioning the multi-level parking near its head office at Mata Rani Chowk, municipal corporation again failed in auctioning the parking lot as the reserved price disappointed the bidders.

Advertisement


Though 11 bidders came forward for the auction, no one placed a bid against the reserved price of Rs. 37.44 lakh against the last year's Rs. 25.87 lakh.

According to MC, the reserved price was increased as while the rest of the parking lots in the city were fetching huge amounts, the multi-level parking at the centre of the old city, which was also a congested area, was not fetching a lucrative price.

Kamlesh Bansal, zonal commissioner of Zone A, said the bid for the parking at Mata Rani Chowk was postponed as the 11 bidders, who turned up, did not bid for the parking. “The committee that has been formed for the auction of the parking would bring out a new date for the auction soon,” said Bnasal.

Interestingly, the contract for the parking expired on March 28, but the MC failed to conduct a timely auction due to technical reasons. The contractor has also got the term of his contract extended for one month's time at a payment of Rs. 2.15 lakh. Thereafter, the MC will look after the parking's operations till a new contractor takes over.

The civic body has also revised the parking fee rates this year. After the new contractor takes over, the parking rates will be Rs. 5 for bicycle, Rs. 10 for two-wheelers Rs. 20 for car and jeep and Rs. 80 for tempo.

A report on the required repair works has also been sent to the MC commissioner. The multi-level parking building is riddled with problems, such as broken floor, non-functional lights and lifts, restrooms, among others.

comment Note: By posting your comments here you agree to the terms and conditions of www.hindustantimes.com
blog comments powered by Disqus

Advertisement
more from Ludhiana

Group dynamics, team building training ends at PAU

 A five-day training programme on 'Group Dynamics and Team Building' concluded at the Punjab Agricultural Management Extension and Training Institute (PAMETI), Punjab Agricultural University (PAU), on Saturday.

Advertisement

 
Advertisement
Copyright © 2014 HT Media Limited. All Rights Reserved