[

lbs marg

]
Picture for representation only.(HT Photo)

Metro-6 in Mumbai to be at a height of 38m above ground

Hindustan Times | By Tanushree Venkatraman, Mumbai
UPDATED ON JUN 21, 2019 12:08 AM IST
Part of the corridor to run above 3 stretches, including Metro-4 line, in Kanjurmarg
(Pratik Chorge/HT Photo)
(Pratik Chorge/HT Photo)

Mumbai monsoon: How will infra works affect city

By Sagar Pillai, Mumbai
UPDATED ON JUN 06, 2019 12:08 AM IST
While work on the Metro lines has already started, construction work on coastal road, planned at Rs12, 721 crore, which is expected to decongest city’s traffic, started last year, around October.
The bridge over Laxmi Baug nullah at Ghatkopar depot connects to the Eastern Express Highway (EEH).(HT Photo)
The bridge over Laxmi Baug nullah at Ghatkopar depot connects to the Eastern Express Highway (EEH).(HT Photo)

Can unsafe Ghatkopar bridge be opened? BMC to ask IIT-B experts

Hindustan Times, Mumbai | By HT Correspondent
UPDATED ON JUN 02, 2019 05:11 AM IST
The re-audit after the Himalaya bridge collapse found that there are 29 bridges in the city which are beyond repair and have to re-constructed.
Uma Venkat removes an advertisement stapled to a tree on LBS Marg, Kanjurmarg. (Satish Bate/HT Photo)
Uma Venkat removes an advertisement stapled to a tree on LBS Marg, Kanjurmarg. (Satish Bate/HT Photo)

How a group of housewives prevented Mumbai civic body from cutting 313 trees

Hindustan Times | By Steffy Thevar, Mumbai
UPDATED ON SEP 09, 2018 02:39 AM IST
The women visited BMC offices, spoke to contractors and also asked members of the neighbouring Naval Housing Colony to join the fight.
Mulund toll plaza is among the three Mumbai Entry Point toll plazas where no toll will be charged for 34 days, starting August 21, 2018.(Praful Gangurde / HT Photo)
Mulund toll plaza is among the three Mumbai Entry Point toll plazas where no toll will be charged for 34 days, starting August 21, 2018.(Praful Gangurde / HT Photo)

Starting Tuesday, no toll for small vehicles at Mulund, Airoli and LBS Marg plazas till Sep 23

By HT Correspondent, Mumbai
UPDATED ON AUG 21, 2018 10:31 AM IST
The spillover traffic of the ongoing repair and renovation work of the bypass has resulted in long queues of vehicles at the three toll plazas on the roads leading to Thane. The time taken up for the collection of the toll has been attributed as a major reason for the jams.
The incident took place in Kalpataru Aura complex on LBS Marg. No damage to life and property has been reported.(HT Photo)
The incident took place in Kalpataru Aura complex on LBS Marg. No damage to life and property has been reported.(HT Photo)

Another wall collapse in Mumbai’s Ghatkopar housing complex

Hindustan Times | By Sagar Pillai, Mumbai
PUBLISHED ON JUL 07, 2018 12:14 AM IST
Part of wall falls down a day after the Brihanmumbai Municipal Corporation served a notice to the builder to repair cracks on the wall
Only a part of the compound wall has caved in as of now.(Pratik Chorge/HT Photo)
Only a part of the compound wall has caved in as of now.(Pratik Chorge/HT Photo)

Compound wall of housing complex in Mumbai’s Ghatkopar caves in; no injuries reported

Hindustan Times | By HT Correspondent, Mumbai
UPDATED ON JUL 06, 2018 12:56 PM IST
A part of the area around the compound wall of the upscale Kalpataru Aura complex on LBS Marg collapsed on Friday morning.
SHARE
Story Saved