...
...
Next Story

NCRTC installs 200-tonne steel span at Barapullah for RRTS corridor

First, the girders were lifted individually from the ground and placed on the Barapullah flyover using two cranes stationed on one side

Published on: May 16, 2025, 06:16:14 IST
Advertisement

The National Capital Region Transport Corporation (NCRTC) has completed the installation of a 200-tonne steel span with four girders over the Barapullah flyover, connecting Sarai Kale Khan station with the upcoming Jangpura stabling yard on the Delhi-Ghaziabad-Meerut RRTS Corridor, officials said on Thursday.

The entire corridor is scheduled to become operational by mid-2025, officials said. (HT Photo)
The entire corridor is scheduled to become operational by mid-2025, officials said. (HT Photo)

The installation was completed over 10 nights in coordination with the Public Works Department (PWD) and Delhi Traffic Police to minimise disruption to traffic, according to NCRTC. Officials also stated that the Jangpura stabling yard, situated near Sarai Kale Khan station, is being developed to accommodate Namo Bharat trains, which are part of the RRTS project.

“For the construction of a viaduct in the elevated section of the Namo Bharat corridor, NCRTC usually erects pillars at an average distance of 34 metres,” said NCRTC spokesperson Puneet Vats. He said that in some complex areas, where the corridor crosses rivers, bridges, rail crossings, metro corridors, expressways or other such existing structures, it is not practically possible to maintain this distance between pillars. “In such areas, special steel spans are used,” Vats said.

The installation process involved a two-stage lifting method using three high-capacity cranes. First, the girders were lifted individually from the ground and placed on the Barapullah flyover using two cranes stationed on one side. In the second stage, two cranes positioned on either side of the flyover were used to install the girders on designated pillars, the spokesperson explained.

To ensure public safety during the complex operation, alternate power supply arrangements were made in coordination with Delhi Transco Limited, as a 220 KW high-tension line passes above the area, officials said. The 4.5 km Delhi section of the corridor between Sarai Kale Khan and New Ashok Nagar is preparing for operations, with trial runs on this stretch having begun on April 13. Currently, Namo Bharat trains are operational across 11 stations along the 55 km stretch from New Ashok Nagar to Meerut South, they added.

The entire corridor is scheduled to become operational by mid-2025, officials said.

 
ABOUT THE AUTHOR
Snehil Sinha

Snehil Sinha is an Assistant Editor with the Delhi Metro bureau of Hindustan Times, where she reports on politics, governance, public policy, urban infrastructure and transport, subjects that shape the everyday lives of millions in the national capital. Over a journalism career spanning 14 years, she has built a reputation for meticulous, data-driven reporting that combines on-ground perspectives with policy analysis. She began her career with The Indian Express before joining Hindustan Times, where she has reported extensively on civic administration and urban governance in Gurugram, Noida and now Delhi. Her reporting is distinguished by its clarity, depth and balance. Whether covering large-scale infrastructure projects, environmental challenges, transport reforms or government policy, she tries to translate complex administrative decisions into accessible, engaging stories without losing nuance. Her work reflects a strong command of public records, official data and field reporting, often connecting policy announcements with their impact on citizens. Her stories go beyond headlines to explain how governance decisions influence the city's growth, mobility and quality of life, making her work an important contribution to informed public discourse.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
SHARE THIS ARTICLE ON
Hindustantimes wants to start sending you push notifications. Click allow to subscribe