...
...
Next Story

South Delhi civic body’s radio tag project delayed due to construction ban

The RFID system facilitates automatic deduction of toll tax from the vehicle owner’s account without having to stop the vehicle at border points. The sensors read the tags on vehicles and deduct the toll amount from their e-purses.

Published on: Nov 14, 2018, 12:31:40 IST
Hindustan Times, New Delhi | By
Prefer HTon Google
Advertisement

The South Delhi Municipal Corporation’s ambitious plan to install the radio frequency identification detection (RFID) system to collect toll tax from commercial vehicles entering the national capital from 12 entry points has been hit by the ban on construction activity.

Ratio Frequency Identification Detection (RFID) system to collect toll tax from commercial vehicles entering Delhi was recommended by the EPCA to decongest the city’s borders and restrict entry of non-destined trucks. (HT File)
Ratio Frequency Identification Detection (RFID) system to collect toll tax from commercial vehicles entering Delhi was recommended by the EPCA to decongest the city’s borders and restrict entry of non-destined trucks. (HT File)

The RFID system, which was to be made operational by mid-November, will now be completed by next month, a senior SDMC official said.

SMDC officials say the road surface near the toll booths at all the entry points have to dug up to lay cables for the sophisticated system and then covered with ready-mix concrete (RMC).

At all toll points, work on roads and crash barriers has been halted due to the ban of construction activity between 6 pm and 6 am in Delhi-NCR .

“Construction work is mainly carried out at night to ensure minimum inconvenience to commuters. It is during this time we transport concrete mixture from the ready-mix concrete plants in NCR to construction sites in the city. The material has to be transported fast as it can’t be utilised if kept unused for over two hours. The trucks carrying RMC mix used to enter the city after 11pm. But now the Environment Pollution (Prevention and Control) Authority (EPCA) has banned construction activity at night,” said a senior SDMC official on condition of anonymity.

The electronic system of toll collection was recommended by the EPCA to decongest the city’s borders and restrict entry of non-destined trucks.

The new system will reduce congestion on highways, an SDMC official said, as vehicles pile up during manual collection of toll tax, choking the borders and causing air pollution.

The system facilitates automatic deduction of toll tax from the vehicle owner’s account without having to stop the vehicle at border points. The sensors read the tags on vehicles and deduct the toll amount from their e-purses.

The project included installing RFID sensors at specific lanes at each of the border points receiving majority of vehicles (80%) by November 20. These toll points are Tikri, Aya Nagar, Kapashera, Rajokri, Kundli, Kalindi Kunj, two entry points at Shahdara, Delhi-Noida Direct flyway, two at Badarpur border and two near Ghazipur.

However, to date, the civic agency has installed the system only at the Aya Nagar toll booth. Work has been stalled in the rest due to the ban on construction action at night, said SDMC officials.

 
ABOUT THE AUTHOR
Vibha Sharma

Vibha Sharma covers municipal bodies in Delhi. A journalist for almost a decade, she has also worked for the hyper-local editions of Hindustan Times, covering civic concerns in south Delhi, Gurgaon, and Ghaziabad.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
SHARE THIS ARTICLE ON
Notifications

Get breaking alerts directly from the newsroom

Notifications are on!You'll be notified when news breaks