Sign in

DMRC completes tunnelling on Dwarka-Najafgarh Metro corridor

NEW DELHI: The Delhi Metro Rail Corporation (DMRC) completed the tunnelling on the under construction Dwarka–Najafgarh corridor (Line-9) as part of the Delhi Metro’s

Published on: Jun 27, 2016, 11:59:29 IST
Share
Share via
  • facebook
  • twitter
  • linkedin
  • whatsapp
Copy link
  • copy link

NEW DELHI: The Delhi Metro Rail Corporation (DMRC) completed the tunnelling on the under construction Dwarka–Najafgarh corridor (Line-9) as part of the Delhi Metro’s Phase-III project in South-West Delhi.

HT Image
HT Image

The 400 metric tonne Tunnel Boring Machine (TBM) emerged at Najafgarh retrieval shaft near Tura Mandi site after making a 0.67 KM (555 rings) long tunnel from the site near Sai Baba Mandir of Najafgarh, sources said.

At this point the elevated alignment coming from Dwarka goes underground through a ramp. The tunnelling on this stretch began on November 9 last year. The depth of the tunnel varies from 6.1 metre to 10.5 metre below the ground surface, they said.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.