The absence of a 220 KV grid power house in Old Gurugram has been a significant hurdle in meeting the area’s increasing electricity demands. To address this, DHBVN and HVPNL have planned to upgrade the existing 66 KV power house to a 220 KV capacity
An inquiry is on to find out whether the power supply was switched on accidentally or due to negligence while the DHBVN assistant lineman was working on it