...
...
Next Story

Shiv Vihar-Trilokpuri section of Delhi Metro’s Pink Line to open by November-end

The 59-km Majlis Park-Shiv Vihar corridor, which is being inaugurated in sections, once fully operational will become the longest corridor on the Delhi Metro network.

Updated on: Oct 5, 2018, 15:55:49 IST
Hindustan Times, New Delhi | By
Prefer HTon Google
Advertisement

The Delhi Metro is set to throw open during the coming festive season two sections of the Pink Line, connecting Majlis Park and Shiv Vihar .

The 59-km Majlis Park-Shiv Vihar corridor, which is being inaugurated in sections, once fully operational will become the longest corridor on the Delhi Metro network. (Sanchit Khanna/HT PHOTO)
The 59-km Majlis Park-Shiv Vihar corridor, which is being inaugurated in sections, once fully operational will become the longest corridor on the Delhi Metro network. (Sanchit Khanna/HT PHOTO)

By November end, around Diwali, the 17.83-km Shiv Vihar-Trilokpuri section is likely to be opened to public. The Lajpat Nagar-Mayur Vihar Pocket-I, which is 9.7-km in length, is also expected to be ready for commuter use around Christmas, the Delhi Metro Rail Corporation (DMRC) said.

DMRC managing director Mangu Singh said that the work on the line is completed and trial runs are being carried on these sections.

“Lajpat Nagar and Mayur Vihar Phase-I are operational, interchange stations and the trial from Lajpat Nagar till Mayur Vihar Pocket-I can be done only after passenger services are closed from Lajpat Nagar to Majlis Park (Pink Line) and Mayur Vihar to Indraprastha (Blue Line),” Singh said.

He said that the Lajpat Nagar station is an interlocking station till the Hazrat Nizamuddin station, and Mayur Vihar Phase-I is an interlocking station between Mayur Vihar and Indraprastha station. To conduct trials, the existing arrangement on the operational section has to be closed every day after the last train at Lajpat Nagar. This also needs to be restored to a functional condition before the commuter services begin in the morning.

The opening of this line will come as a huge relief to commuters, who will get a direct connection from north to east Delhi. The opening of the Lajpat Nagar-Mayur Vihar Pocket-I section will also throw open the Hazrat Nizamuddin station for commuters, which will make the railway station in the area more accessible.

The 59-km Majlis Park-Shiv Vihar corridor, which is being inaugurated in sections, once fully operational will become the longest corridor on the Delhi Metro network.

 
ABOUT THE AUTHOR
Soumya Pillai

Soumya Pillai covers environment and traffic in Delhi. A journalist for three years, she has grown up in and with Delhi, which is often reflected in the stories she does about life in the city. She also enjoys writing on social innovations.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
SHARE THIS ARTICLE ON
Hindustantimes wants to start sending you push notifications. Click allow to subscribe