Mumbai-Ahmedabad bullet train to have separate toilets for women, breastfeeding rooms | Latest News India - Hindustan Times
close_game
close_game

Mumbai-Ahmedabad bullet train to have separate toilets for women, breastfeeding rooms

Press Trust of India, New Delhi | ByPress Trust of India
Jul 08, 2017 06:49 PM IST

The new bullet trains will also have baby changing rooms comprising baby toilet seats, tables for diaper disposal and a low sink for children for washing hands.

Rail passengers can look forward to an entirely new kind of toilet system -- urinals, western-style toilets with hot water and washing closet seat facility and separate washrooms for men and women equipped with triple mirrors for make-up.

The bullet trains will have special facilities for women.(Shutterstock/ Representational Image)
The bullet trains will have special facilities for women.(Shutterstock/ Representational Image)

The E5 Shinkansen series bullet trains to be pressed into service on the upcoming Mumbai-Ahmedabad high speed corridor will also have baby changing rooms comprising baby toilet seats, tables for diaper disposal and a low sink for children for washing hands.

Hindustan Times - your fastest source for breaking news! Read now.

Railways is gearing up to acquire 25 E5 Shinkasen series bullet trains from Japan at an estimated cost of Rs 5,000 crore for the Narendra Modi government’s first bullet train project.

The 731-seater E5 series Shinkansen bullet train, a new generation Japanese high speed train, will also have multi- purpose room to be used for breast feeding and also for sick passengers.

Besides, there will be two extra-spacious toilets for wheelchair-bound passengers in the 10-coach high-speed train.

Facilities of separate restrooms and toilets for men and women while introducing wall-mounted type urinals for men in the high speed train are in the offing for the first time in Indian Railways, said a senior railway ministry official involved with the Rs 1 lakh crore bullet train project.

However, urinals and toilets will be installed in alternate coaches in the train. For example, toilets will be installed in coach number 1, 3, 5, 7 and 9 while urinals will be available in coach number 2, 4, 6 and 8.

Washrooms for men and women will also be placed in similar way.

There will be luggage space for business class passengers in the train. Besides business, there will be also standard class passengers. While the train will have 698 seats for standard class, 55 seats will be earmarked for business class.

The bullet train with seating facility will take about 2 hours 7 minutes to travel 508-km distance between Mumbai and Ahmedabad.

Most of the corridor will be elevated, except for a 21-km underground tunnel between Thane and Virar, of which 7 km will be under sea.

The undersea tunnel was chosen to avoid damaging the thick vegetation present in the area.

The corridor will begin at the underground station in the Bandra-Kurla Complex in Mumbai, and then traverse 21 km underground before emerging above ground at Thane.

JICA has agreed to fund 81% of the total project cost through a 50-year loan at an interest rate of 0.1% and a moratorium on repayments up to 15 years.

Indian Railways will invest Rs 9,800 crore in the high- speed rail project and the remaining cost will be borne by the state governments of Maharashtra and Gujarat.

Unveiling 'Elections 2024: The Big Picture', a fresh segment in HT's talk show 'The Interview with Kumkum Chadha', where leaders across the political spectrum discuss the upcoming general elections. Watch Now!

Get Current Updates on India News, PM Narendra Modi Live Updates along with Latest News and Top Headlines from India and around the world
SHARE THIS ARTICLE ON
Share this article
SHARE
Story Saved
Live Score
OPEN APP
Saved Articles
Following
My Reads
Sign out
New Delhi 0C
Tuesday, March 05, 2024
Start 14 Days Free Trial Subscribe Now
Follow Us On