...
...
Next Story

NVDA to prepare master plan

THE NARMADA Valley Development Authority (NVDA) has decided to prepare a master plan on unexplored hydel power potential available in Narmada valley.

Published on: Nov 13, 2006 04:02 PM IST
None | By , Bhopal
Advertisement

THE NARMADA Valley Development Authority (NVDA) has decided to prepare a master plan on unexplored hydel power potential available in Narmada valley.

HT Image
HT Image

For this, the Indian Institute Of Technology (IIT), Roorkee will conduct a technical study in the Narmada basin. NVDA Vice Chairman Uday Kumar Verma said on Sunday that besides major hydel power projects being constructed in the Valley, there was a possibility of large unexplored hydel power potential in Narmada basin.

He said in view of the present and future power demand of the State, there was a great need to exploit even the smallest hydel power potential.

In this scenario, NVDA had approached IIT, Roorkee to conduct the survey and study unexplored potential. Verma said Alternate Hydro Energy Center (AHEC) of IIT Roorkee has well-equipped facilities specially created to cater to needs of studying small hydropower projects.

The AHEC will conduct the study and prepare composite master plan that will help prepare detailed project reports. Verma added that besides major hydel power projects, the NVDA had already explored possibilities of nine mini hydel power projects in upper Narmada zone.

These are, Raghavpur (20 MW), Rosra (35 MW), Basania (60 MW), Chinki (50 MW), Sitareva (15 MW), Handia (51 MW), Boras (55 MW), Hoshangabad (60 MW), and Gopalpur (25 MW).

 
Check India news real-time updates, latest news on Hindustan Times and more across India.
Check India news real-time updates, latest news on Hindustan Times and more across India.
SHARE THIS ARTICLE ON