The Indian Army, which is constructing three foot over-bridges (FOBs) in Mumbai, is doing the last leg of work for the FOB at Elphinstone Road station.

Currently, work on the FOB’s pre-fabricated staircase and roof are underway. The FOB is expected to be ready by February 15.
The Army was roped in following the stampede on the narrow Elphinstone Road station on September 29, 2017, which led to the death of 23 city commuters. Work on the three FOBs — at Elphinstone Road, Currey Road and Ambivali (beyond Kalyan) stations — kicked off in November 2017.
Watch | Our time-lapse video on how the Bailey bridge was installed:
For three days last month, on January 26, 27 and 28, the Western Railway scheduled mega blocks on the line to facilitate the Army’s work. On January 28, Bombay Sappers, a wing of Indian Army Corps of Engineers, which is building in the FOBs, installed a Bailey bridge — a pre-fabricated truss bridge — at Elphinstone Road
{{/usCountry}}For three days last month, on January 26, 27 and 28, the Western Railway scheduled mega blocks on the line to facilitate the Army’s work. On January 28, Bombay Sappers, a wing of Indian Army Corps of Engineers, which is building in the FOBs, installed a Bailey bridge — a pre-fabricated truss bridge — at Elphinstone Road
{{/usCountry}}Follow @HTMumbai for updates on Mumbai news.
Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.
Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.