...
...
Next Story

WR greenlights repair work

In a bid to stop derailments and signal failures that often delay suburban services, the Western Railway (WR) is now taking up major repair work of its tracks and signals from next month. Shashank Rao reports.

Updated on: Jul 11, 2011 12:43 AM IST
Hindustan Times | By , Mumbai
Prefer HTon Google
Advertisement

In a bid to stop derailments and signal failures that often delay suburban services, the Western Railway (WR) is now taking up major repair work of its tracks and signals from next month.

HT Image
HT Image

The WR is in the process of replacing defective tracks and improving the quality of signaling system along several stretches on the Churchgate-Virar route. Though these works are technical in nature and might not hamper train services, they are essential for smooth train operations in future, say WR officials.

The defective tracks are the old ones with weak welding conjoining two tracks. In worst conditions, it could also lead to derailment. Sources said that the step to strengthen tracks was taken after two trains derailed at Andheri on June 20 and 22.

Dadar, Andheri, Borivli and Bhayander, are the important junctions from where the authorities will be coordinating the work. The tenders will be opened in August.

“We will be replacing the rails with longer length of welded tracks that last long,” said a WR official on condition of anonymity as he is not authorised to speak to the media.

On July 8, when the city saw the highest rain for this season, these crossovers were locked so that the joints don’t become bad and end up in derailment of trains. The cost of improving the quality of tracks is around Rs30.50 lakh. At the same time signaling system will be made durable to tackle rains. The authorities will replace copper wires connecting signals to the tracks with another metal called cadmium bronze. Copper wires are either stolen by thieves or they incur problems affecting the functioning of a signal due to rains.

“This will improve the circuit connecting the signal and tracks and also reduce signal failures during heavy rains,” said S Chandrayan, chief PRO, Western Railway.

The signal works, at a cost of Rs27.45 lakh, will be completed in phases, with the first half covering the Churchgate-Kandivli section and the second phase covering the Borivali-Virar section.

 
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.
SHARE THIS ARTICLE ON
Hindustantimes wants to start sending you push notifications. Click allow to subscribe