...
...
Next Story

PWD, art panel fight over bypass project

Public Works Department (PWD) and Delhi Urban Arts Commission (DUAC) have once again come face to face on the proposed alignment of the Ring Road Bypass project, reports Atul Mathur.

Updated on: Oct 27, 2008 11:34 PM IST
Hindustan Times | By , New Delhi
Prefer HTon Google
Advertisement

Public Works Department (PWD) and Delhi Urban Arts Commission (DUAC) have once again come face to face on the proposed alignment of the Ring Road Bypass project.

HT Image
HT Image

PWD sources say the objections raised by DUAC on the alignment of the bypass, which connects Yamuna Velodrome with Salim Garh fort, has jeopardised its construction.

PWD sources said that the DUAC has been sitting over the project for almost two years and any further delay will leave little time for the PWD to complete the project.

The Bypass project has been conceived to decongest the Ring Road between Indraprastha Estate and Hanuman Setu behind the Red Fort.

The 6.1-km long bypass is expected to cost Rs 650.34 crore. According to a survey, more than 2.1 lakh vehicles pass through Rajghat and Shantivan traffic intersections on Ring Road every day.

“The DUAC has now asked us to change the alignment of the road to prevent about 200 trees along the ring road from cutting. Even if we make those changes, we will still have to cut the equal number of trees. Rather, it will create problems for merging traffic at various points,” a PWD engineer said.

PWD officials said the construction has to be completed before the Commonwealth Games 2010 for which they are now left with less than two years.

“Execution of a project of this magnitude requires a minimum of 18-20 months. We cannot afford to delay the commencement of this project,” PWD superintending engineer Sarvagya Srivastava said.

Running against time, the PWD has now asked DUAC to clear the project immediately paving way for its construction.

“We have made several modifications in the project as suggested by DUAC. But it has now asked us to change the alignment of the road to prevent about 200 trees along the ring road. Even if we make those changes, we will still have to cut the equal number of trees, rather it is going to create a mess,” Srivastava added.

 
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
SHARE THIS ARTICLE ON
Hindustantimes wants to start sending you push notifications. Click allow to subscribe