[

reach

]
An apple orchard after fresh snowfall covered the hills with a white blanket in the upper Shimla area on Saturday.(HT Photo)

Atal Tunnel closed again after heavy snowfall in higher reaches of Himachal

Hindustan Times, Shimla | By HT Correspondent
PUBLISHED ON DEC 12, 2020 12:56 PM IST
Weather will remain clear from Sunday to Thursday, says meteorological department
The newly inaugurated Atal Tunnel across the Rohtang Pass is on the Manali-Leh highway.(HT Photo)
The newly inaugurated Atal Tunnel across the Rohtang Pass is on the Manali-Leh highway.(HT Photo)

Snow in HP’s higher reaches disrupts traffic on Manali-Leh highway

Hindustan Times, Shimla | By HT Correspondent
PUBLISHED ON NOV 02, 2020 12:22 PM IST
Kullu SP says vehicles are not being allowed beyond Gulaba towards Rohtang Pass though the newly inaugurated Atal Tunnel is functional.
HT Image
HT Image

Light snowfall in upper reaches of Kashmir

Hindustan Times/Srinagar | By HT Correspondent, Srinagar
UPDATED ON OCT 25, 2020 07:08 PM IST
The meteorological department has predicted dry weather in the UT till the first week of November but has not ruled out the possibility of light snow fall in the upper reaches of the Valley
Snow and rain is likely to continue in middle and higher hills of the state for the next two days.(ANI)
Snow and rain is likely to continue in middle and higher hills of the state for the next two days.(ANI)

Fresh spell of snow in higher reaches of Himachal

Hindustan Times, Shimla | By HT Correspondent, Shimla
UPDATED ON MAR 27, 2020 07:31 PM IST
An orange warning stands for ‘alert’ and authorities are expected to be prepared.
Locals and tourists making their way through light rain on The Ridge in Shimla on Monday.(Deepak Sansta /HT)
Locals and tourists making their way through light rain on The Ridge in Shimla on Monday.(Deepak Sansta /HT)

More snowfall in higher reaches of Himachal

Hindustan Times, Shimla | By HT Correspondent, Shimla
UPDATED ON JAN 06, 2020 05:58 PM IST
Bharmour in Kullu received 5cm snow, Gondla and Keylong in Lahaul-Spiti received 3cm and 2.5cm snow, respectively; while Kalpa in Kinnaur received 0.2 cm snow
A file photo of Umesh Yadav.(PTI)
A file photo of Umesh Yadav.(PTI)

Windies A reach 86/3 in reply to India A’s 201 before rain halts 2nd day’s play

Tarouba | By Press Trust of India
UPDATED ON AUG 08, 2019 08:38 AM IST
West Indies A still trail the visitors by 115 runs with seven wickets in hand in the four-day match.
This would be the second metro line in Ghaziabad and the first metro link connecting the interiors of the city.(Sakib Ali/HT Photo)
This would be the second metro line in Ghaziabad and the first metro link connecting the interiors of the city.(Sakib Ali/HT Photo)

Delhi Metro to expand reach as Dilshad Garden-Ghaziabad line gets Cabinet nod

Hindustan Times, New Delhi | By HT Correspondent
UPDATED ON JAN 24, 2019 10:01 AM IST
The total cost of the line is about Rs1,710 crore, along with a grant by the Centre.
SHARE
Story Saved