...
...
Next Story

12-hour check-in failure at Terminal 3 caused by malicious virus attack?

The collapse of the check-in system at Delhi airport’s Terminal 3, on June 29 — which delayed more than 50 flights — could have been caused by a virus attack. Sidhartha Roy reports.

Updated on: Jul 05, 2011 12:03 AM IST
Hindustan Times | By , New Delhi
Prefer HTon Google
Advertisement

The collapse of the check-in system at Delhi airport’s Terminal 3, on June 29 — which delayed more than 50 flights — could have been caused by a virus attack.

HT Image
HT Image

On June 29, 2011, a technical snag in the check-in system of Terminal 3 led to flight delays of 30 min to one hour, as airlines had to manually check-in passengers. The problem first surfaced at 3am and took unusually long — 12 hours — to be fixed.

According to sources at the airport, the initial investigation into the cause of the glitch hints at a ‘malicious virus attack’ on the system. The team investigating the incident is trying to find the source of the virus attack.

Immediately after the problem occurred, a joint team of ARINC, the US-based company that has installed the system, WIPRO’s IT engineers and the IT team of private airport operator Delhi International Airport Limited (DIAL) started working on restoring the system.

“There was an infusion in the backend server of the system, caused by a malicious virus attack,” said the official. “Those who were logged in at that time managed to work on the system, even as other counters couldn’t be operated. However, as the system got corrupted, those who tried to log in later couldn’t do so,” he said.

When contacted, senior officials of ARINC refused to either confirm or deny that a virus was behind the collapse of the check in system.

“There was an outage on June 29 and the investigations are on but it would be inappropriate to comment on that at the moment,” said Jim Martin, managing director, Asia-Pacific Operations, ARINC. Martin, however, said that the investigators are pretty close to what the cause of the outage was and that the system logs are being examined, at present.

The glitch had affected the Common User Terminal Equipment (CUTE) software, which helps streamline the reservation system and facilitates the checking-in of passengers of individual airlines from a common terminal.

The check-in system of T3 had also failed on December 17, 2010, leading to delays.

 
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.
SHARE THIS ARTICLE ON
Hindustantimes wants to start sending you push notifications. Click allow to subscribe