[

e-way

]
The axed tree on Ferozepur Road in Ludhiana on Tuesday.(Harsimar Pal Singh/HT)

80-year-old banyan tree axed to give way to e-way in Ludhiana

Hindustan Times, Ludhiana | By Mohit Khanna, Ludhiana
UPDATED ON DEC 03, 2019 10:17 PM IST
The incident has triggered an outrage among green activists of the city
The 136-kilometre long expressway was thrown open to the public by Prime Minister Narendra Modi in November 2018.
The 136-kilometre long expressway was thrown open to the public by Prime Minister Narendra Modi in November 2018.

Subhash Chandra’s firm to get 225-cr bailout to finish e-way

Hindustan Times | By Hitender Rao, Chandigarh
UPDATED ON SEP 28, 2019 05:19 PM IST
KMP e-way HSIIDC presented grim prospect of termination of contract which could lead to burden of termination payments on exchequer apart from rendering project dysfunctional, says finance department
Traffic signals are to be reintroduced at three junctions on the Delhi-Gurgaon Expressway.(PTI image)
Traffic signals are to be reintroduced at three junctions on the Delhi-Gurgaon Expressway.(PTI image)

Gurugram traffic lights likely to return at key junctions on e-way

Hindustan Times, Gurugram | By Kartik Kumar
UPDATED ON JUL 31, 2019 08:18 PM IST
Traffic signals were removed from the three junctions after an underpass was constructed at each of these points in 2017-18 by the National Highways Authority of India (NHAI).
With the monsoon around the corner, state PWD minister Rao Narbir Singh, along with the department officials, on Monday, inspected the stormwater drains along the Delhi-Gurgaon Expressway and those in Behrampur village.(HT Photo)
With the monsoon around the corner, state PWD minister Rao Narbir Singh, along with the department officials, on Monday, inspected the stormwater drains along the Delhi-Gurgaon Expressway and those in Behrampur village.(HT Photo)

Minister orders cleaning of drains along e-way in 3 days

Gurugram | By HT Correspondent
UPDATED ON JUN 18, 2019 12:48 AM IST
This stretch of road has been the worst affected due to flooding in the past few years, leading to frequent traffic congestion.
Due to a breakdown of a truck, traffic movement between Rajiv Chowk and Signature Towers on Delhi-Gurgaon Expressway was hampered for nearly five hours this morning, in Gurugram, India, on Friday, June 14, 2019.((Photo by Yogendra Kumar/Hindustan Times))
Due to a breakdown of a truck, traffic movement between Rajiv Chowk and Signature Towers on Delhi-Gurgaon Expressway was hampered for nearly five hours this morning, in Gurugram, India, on Friday, June 14, 2019.((Photo by Yogendra Kumar/Hindustan Times))

Truck breaks down, triggers 4.7-km traffic jam on e-way

Hindustan Times, Gurugram | By Kartik Kumar
PUBLISHED ON JUN 15, 2019 04:20 AM IST
With the truck remaining stationery, vehicular movement started getting hampered, especially between 9am and 10.30am, peak traffic hours, resulting in a 4.7 kilometre snarl between Rajiv Chowk and Signature Towers.
The Mumbai-Pune Expressway was shut for two hours on September 6, 2018, as MSRDC installed an overhead gantry at Shedung Phata.(Ht File)
The Mumbai-Pune Expressway was shut for two hours on September 6, 2018, as MSRDC installed an overhead gantry at Shedung Phata.(Ht File)

Mumbai-bound carriageway of E-way shut for 2 hrs today

Hindustan Times, Mumbai | By Pranab Jyoti Bhuyan
PUBLISHED ON MAY 22, 2019 05:13 AM IST
Heavy vehicles will have to wait on the side until the road is re-opened at 2 pm, a senior officer said.
The truck developed a snag when driver Anoop and co-passenger Chandradeo were heading to North Delhi to deliver milk, flour, beverages, groceries, to a private company.(HT Photo)
The truck developed a snag when driver Anoop and co-passenger Chandradeo were heading to North Delhi to deliver milk, flour, beverages, groceries, to a private company.(HT Photo)

Hour-long jam on e-way as truck catches fire in Gurugram

Hindustan Times, Gurugram | By HT Correspondent
PUBLISHED ON MAY 16, 2019 04:34 AM IST
As per fire department officials, a truck carrying daily essential items caught fire on top of an overhead flyover on the carriageway from Manesar to New Delhi.
The woman was tied up, molested, severely beaten up, robbed and dumped nearly 7km away on the Link Road connecting NH-9 to the Delhi-Meerut Road.(Picture for representation)
The woman was tied up, molested, severely beaten up, robbed and dumped nearly 7km away on the Link Road connecting NH-9 to the Delhi-Meerut Road.(Picture for representation)

Ghaziabad’s auto gang abducts, molests, robs 18-year-old on Delhi-Meerut e-way

Hindustan Times, Ghaziabad | By Peeyush Khandelwal
PUBLISHED ON MAR 14, 2019 03:39 AM IST
A gang of armed robbers in an autorickshaw struck for the second time in the three days on the National Highway-9 and abducted a Delhi University student who was travelling to her home in Indirapuram in their autorickshaw late on Tuesday.
The accident took place around 5pm when the passengers were returning to Delhi after visiting the Bankey Behari temple in Vrindavan, added cops.(File)
The accident took place around 5pm when the passengers were returning to Delhi after visiting the Bankey Behari temple in Vrindavan, added cops.(File)

6 killed in mishaps on e-ways connecting Agra

Hindustan Times, Agra | By HT Correspondent, Agra
PUBLISHED ON JAN 04, 2019 01:15 PM IST
Four were killed on the Yamuna Expressway on Wednesday evening when a Delhi- bound SUV met with an accident after its tyre got punctured, while two others died on Thursday morning when their car rammed into a tractor on the Agra-Lucknow Expressway.
A class at Delhi Public School, Faridabad. The school has successfully implemented tablet-based learning and says it has been able to reduce the weight of bags by 70%.(Biplov Bhuyan/HT Photo)
A class at Delhi Public School, Faridabad. The school has successfully implemented tablet-based learning and says it has been able to reduce the weight of bags by 70%.(Biplov Bhuyan/HT Photo)

The e-way out of heavy school bags

Hindustan Times | By Manoj Sharma and Fareeha Iftikhar
UPDATED ON DEC 09, 2018 04:29 PM IST
Can digital learning help reduce the weight of schools bags? Some schools tried it and failed, while a few succeeded. HT tries to find out if technology can ease the burden on children and the challenges in implementing it
Haryana Chief Minister Manohar Lal Khattar, on Thursday, had announced that this project would be inaugurated by PM Narendra Modi.(HT File Photo)
Haryana Chief Minister Manohar Lal Khattar, on Thursday, had announced that this project would be inaugurated by PM Narendra Modi.(HT File Photo)

Kundli-manesar stretch of western peripheral e-way ready before time

Hindustan Times, Gurgaaon | By HT Correspondent
PUBLISHED ON NOV 03, 2018 03:28 PM IST
The 135­km­ long KMP Expressway will offer seamless connectivity between UP, Uttarakhand, Haryana and Jammu and Kashmir
Traffic jam on E-way near Khandala in Pune.(HT Photo)
Traffic jam on E-way near Khandala in Pune.(HT Photo)

Mumbai-Pune e-way to get new system to manage traffic, curb deaths

Hindustan Times | By Kailash Korde, Mumbai
UPDATED ON AUG 15, 2018 12:33 AM IST
Intelligent Traffic Management System will give advance info to drivers, have automated toll, etc
A 13-kilometre network of the pipelines runs from the Upper Ganga Canal (near Dasna) to Pratap Vihar treatment plants, from where treated Ganga water is supplied to Noida and Ghaziabad.(Sakib Ali/HT Photo)
A 13-kilometre network of the pipelines runs from the Upper Ganga Canal (near Dasna) to Pratap Vihar treatment plants, from where treated Ganga water is supplied to Noida and Ghaziabad.(Sakib Ali/HT Photo)

Ghaziabad: Water pipelines in way of Delhi-Meerut e-way to be shifted soon

Hindustan Times | By Peeyush Khandelwal, Ghaziabad
PUBLISHED ON APR 04, 2018 09:02 PM IST
The water pipelines are a major obstacle for widening the NH-24, which is required for the second phase of the project that starts from UP Gate on NH-24 and ends at Dasna.
The Maharashtra State Road Development Corporation (MSRDC) is planning to construct a toll plaza on the proposed 13.3 kilometre bypass stretch of the Pune-Mumbai expressway between Khopoli and Kusgaon.(HT REPRESENTATIVE PHOTO)
The Maharashtra State Road Development Corporation (MSRDC) is planning to construct a toll plaza on the proposed 13.3 kilometre bypass stretch of the Pune-Mumbai expressway between Khopoli and Kusgaon.(HT REPRESENTATIVE PHOTO)

New proposed bypass stretch on Pune-Mumbai expressway will have tolls

Hindustan Times, Pune | By Shrinivas Deshpande, Pune
UPDATED ON MAR 26, 2018 03:00 PM IST
MSRDC, the nodal agency for the project, has decided to charge toll on the proposed bypass for 15 years from 2030 to 2045 to recover the project cost of rS 4,797 crore.
SHARE
Story Saved