Authorities have opened multiple gates of the Salal Hydroelectric Power Station on the Chenab River following a rise in water inflow caused by continued rainfall in the catchment areas. The controlled release of excess water is aimed at regulating reservoir levels and ensuring the safe operation of the dam. The increased discharge has led to a significant rise in the water level and flow of the Chenab downstream, with authorities monitoring the situation closely.