GMRL seeks 14,000 sqm HSVP land for Gurugram Metro Phase-2 corridor
Gurugram Metro Rail Limited seeks permanent transfer of 14,000 sqm land from HSVP for Phase-2 construction, awaiting World Bank tender approval.
With the tender proposal for Phase-2 of the Gurugram Metro project under consideration by the World Bank, Gurugram Metro Rail Limited (GMRL) has now sought the permanent transfer of over 14,000 sqm of land from the Haryana Shahari Vikas Pradhikaran (HSVP) for construction along the proposed corridor from Sector 9 to Cyber City, according to official documents accessed by HT.

The fresh request, made through a May 8 letter by GMRL Phase-2 project manager Gabdu Ram Choudhary to HSVP, outlines station-wise land requirements for metro viaducts, station infrastructure and entry-exit points along the corridor. GMRL officials said the tender for the project is expected to receive approval by the end of May.
“It is kindly requested to transfer the aforesaid HSVP land to GMRL on a permanent basis to facilitate timely execution of the Priority-2 Corridor of the Gurugram Metro project,” Choudhary stated in the letter.
According to the proposal, the land is located near multiple planned metro stations in DLF Phase 2, including Sector 4, Sector 5, Ashok Vihar, Sector 3, Bajghera Road, Palam Vihar Extension, Palam Vihar, Sector 23A, Sector 22 and Udyog Vihar Phase 1.
Among the stations, Sector-22 has the highest land requirement at 3,334.96 sqm, followed by Sector-23A at over 2,100 sqm and Palam Vihar at more than 1,700 sqm. The proposed requirement for Sector 4 and Bajghera Road stations stands at around 1,664 sqm and over 1,500 sqm, respectively.
Officials said GMRL held several meetings with HSVP officials and project consultants in April before preparing the consolidated land requirement list.
A senior HSVP official said metro rail projects remain the agency’s priority and the request is under consideration.
The Old Gurugram Metro Project spans 28.5 km and is divided into three phases. Phase 1 comprises a 5.2-km corridor from Millennium City Centre to Sector 9, which is currently under construction at an estimated cost of ₹1,277 crore. Phase-2 will extend the corridor to Cyber Hub and is estimated to cost around ₹3,500 crore, while Phase-3 involves construction of a depot in Sector-33 at a projected cost of ₹400 crore.
According to a GMRL survey, the metro corporation requires 24.84 hectares of land for the overall project, including 23.52 hectares of government land and 1.32 hectares of private land. In addition, around 5 hectares of government land is required temporarily during the construction phase.
ABOUT THE AUTHORAbhishek BehlAbhishek Behl is a Special Correspondent with Hindustan Times, Gurugram bureau. With over a decade of experience in journalism, he reports on Gurugram's rapid urban transformation, covering the city's changing infrastructure, governance, and planning landscape. His reporting spans major civic agencies, such as the Gurugram Metropolitan Development Authority (GMDA), Department of Town and Country Planning (DTCP), Haryana Shahari Vikas Pradhikaran (HSVP), and the National Highways Authority of India (NHAI). Behl has reported on key urban development issues such as RRTS projects, metro expansion, road and highway projects, water supply, drainage, mobility, environmental concerns, land use planning, affordable housing, and the city's real estate sector. He closely tracks policy decisions, infrastructure implementation, and their impact on the city and its residents. He also covers regulatory action against illegal constructions, urban flooding, traffic management, and initiatives aimed at improving civic services and sustainable development. Behl has also written on political developments in south Haryana, focusing on elections and governance. His journalism is driven by fact-based reporting, ground-level coverage, and an understanding of the social and economic dynamics of Gurugram. Apart from work he is a cyclist and a cricketer and a resident of Palam Vihar since 2010.Read More
Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.

E-Paper

