Sign in

Mishap probe names guilty, Delhi Metro cracks down

Blaming “deficiency” in design and material for the July 12 mishap which claimed six lives at a construction site near Zamrudpur, Delhi Metro cracked down on the contractor, two design consultant companies and a few engineers for not doing their job properly, reports Atul Mathur.

Updated on: Jul 29, 2009, 01:15:55 IST
Hindustan Times | By , New Delhi
Share
Share via
  • facebook
  • twitter
  • linkedin
  • whatsapp
Copy link
  • copy link

Blaming “deficiency” in design and material for the July 12 mishap which claimed six lives at a construction site near Zamrudpur, Delhi Metro cracked down on the contractor, two design consultant companies and a few engineers for not doing their job properly.

HT Image
HT Image

At a press conference on Tuesday, DMRC managing director E Sreedharan said a four-member inquiry committee found that the cantilever design “had not adequately taken care of various forces”.

Sreedharan said a show-cause notice was being served on contractor Gammon India, which was carrying out the work at Zamrudpur accident site, on why it should not be blacklisted for two years.

DMRC also blacklisted Arch Consultancy Services, independent design consultants, for five years for submitting faulty designs.

Tandon Construction, independent structural consultants, were blacklisted for two years.

DMRC also issued a “major penalty chargesheet” to chief engineer (design) RK Kataria and suspended a deputy chief engineer (design) along with a deputy project manager.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.