32 breakthroughs complete for Mumbai Metro-3
The Mumbai Metro Rail Corporation (MMRC), on Monday, completed the 32nd tunnel breakthrough along the Metro-3 (Colaba-Bandra-Seepz) underground corridor. MMRC, which
The Mumbai Metro Rail Corporation (MMRC), on Monday, completed the 32nd tunnel breakthrough along the Metro-3 (Colaba-Bandra-Seepz) underground corridor. MMRC, which is executing the project, has completed 87% tunnelling works and 60% of the overall civil works, a statement issued by the organisation read.

On Monday, the Herrenknech tunnel boring machine (TBM) Krishna-2 completed the 1.10-km-long tunnel from Siddhivinayak north shaft to the underground Dadar Metro station.
Ranjit Singh Deol, managing director, MMRC said, “Today’s breakthrough was a challenging task as Dadar Metro station — one of the more prominent stations on the Colaba-Bandra-SEEPZ corridor — is located in close proximity of residential buildings and commercial shops.”
Ashutosh Kumbhakoni, advocate general of the state who was present at the breakthrough, said, “I appreciate that a monumental task is being completed while causing as little inconvenience to the public as possible. This line will be an important addition to the public transport infrastructure and a boon to Mumbaiites.”
According to officials, nine more tunnel breakthroughs can be expected for the 33.5-km corridor that will connect the island city to the western suburbs.
On September 21, Tapi-1 TBM completed its downline stretch between Sahar and Chhatrapati Shivaji International Airport (CSIA) T1 stations.
MMRC has named the 17 TBMs on different rivers.
Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.

E-Paper

