Sign in

This tuesday, No flight disruption

Flight operations were a breeze on Tuesday with not a single disruption during the six-hour partial closure of Mumbai’s only operational runway, reports HT Correspondent.

Updated on: Dec 30, 2009 1:37 AM IST
Hindustan Times | By , Mumbai
Share
Share via
  • facebook
  • twitter
  • linkedin
  • whatsapp
Copy link
  • copy link

Flight operations were a breeze on Tuesday with not a single disruption during the six-hour partial closure of Mumbai’s only operational runway.

HT Image
HT Image

During the partial runway closure from noon to 6 pm, 56 flights took off and landed at the city airport.

No diversions, cancellations or major delays were reported during the period. Airport authorities strictly implemented the partial runway closure timings. At noon sharp, the air traffic control handed over the runway to the Mumbai International Airport Limited (MIAL) staff to move equipment and men to the repaid site.

Partial runway was available for operation at 12.57 pm.

Repair work was stopped at 5 pm and the full runway was available for use an hour later. A MIAL spokesperson said that 80 per cent of repairs on the secondary runway, which was closed on October 1, have been completed. It will open for use from January 31, next year.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.