Uttarakhand tunnel rescue highlights: ‘Will review all tunnels in state to avoid such cases,’ says CM Dhami
Uttarakhand tunnel rescue highlights: All 41 workers trapped in Silkyara tunnel successfully rescued.
Uttarakhand tunnel rescue highlights: Rat-hole mining specialists engaged in rescuing 41 workers trapped in the collapsed Silkyara tunnel in Uttarakhand's Uttarkashi initiated manual drilling through the debris on Monday. In the latest updates, all the 41 trapped workers are successfully removed. Around 1:30 pm on Tuesday, Bansi Dhar Tiwari, the state government's information department, announced the completion of drilling. Shortly after, Chief Minister Pushkar Singh Dhami confirmed on social media that the escape pipe had been laid into the drilled passage, expressing optimism about bringing out all workers soon....Read More
However, hours later the National Disaster Management Authority’s official said that the breakthrough is not yet achieved but the rescuers are quite close.
Finally, at around 7:00pm the breakthrough was achieved and rescuers entered the collapsed tunnel.
At least 12 rat-hole mining experts were tasked with horizontally drilling through the final 10- to 12-meter stretch of debris in the collapsed section of the under-construction tunnel on the Char Dham route in Uttarakhand. The alternative drilling approach was adopted after a large auger machine became stuck on Friday. Approximately 40 per cent of the necessary 86-meter vertical drilling has been completed.
Uttarakhand tunnel rescue LIVE Updates: ‘Not in any hurry, safety precautions implemented, says NDMA
Lieutenant General (Retd.) Syed Ata Hasnain, Member, NDMA, says "All safety precautions will be implemented. No premature announcements are to be made, it will be against all principles. We also have to take care of the safety and security of people who are rescuing the wrokers...We are not in any hurry..."
Uttarakhand tunnel rescue LIVE Updates: 58m of manual drilling done, two more meters to go, says NDMA
Lt Gen (retd)Syed Ata Hasnain, a member of the National Disaster Management Authority (NDMA) said they have reached 58 metres and two more metres remain. He said there will be no premature action. He said all safety precautions are being taken. He said three teams of NDRF will go inside for evacuation, while SDRF will support them. It will take 3 to 5 minutes to take out each worker.
Uttarakhand tunnel rescue LIVE Updates: 58m of debris cut out, says NDMA
Lieutenant General (Retd.) Syed Ata Hasnain, Member, NDMA, says "We are near a breakthrough but not yet there. Manual work has carried on and we have reached 58 metres. The debris had been cut and the work was going on the entire night. Our rat miners, experts and Army engineers have been able to take it to 58 metres and the pipe has been pushed with the help of the auger machine..."
Uttarakhand tunnel rescue LIVE Updates: Families await safe return

Anticipation had been building up at the disaster site on the Char Dham route hours before the news broke outside.
Uttarakhand tunnel rescue LIVE Updates: Chinook helicopter ready to airlift
Uttarakhand tunnel rescue LIVE Updates: Food sent along with ambulances
"The food (for the trapped workers) is being sent along with the ambulance. Aloo gobhi, roti, dal and rice is in the menu today," said Vikas Rana, Assistant HR at Hyderabad-based Navayuga Engineering Company Limited, the company constructing the tunnel.
Uttarakhand tunnel rescue LIVE Updates: Latest visuals of evacuation work
Uttarakhand tunnel rescue LIVE Updates: Temporary medical facility established inside tunnel
A temporary medical facility has been expanded inside the tunnel. After evacuating the trapped workers, their health check up will be done at this facility. In case of any problems, 8 beds have been arranged by the health department and a team of doctors and experts are on standby.
Uttarakhand tunnel rescue LIVE Updates: Beds, chairs ready for workers
Uttarakhand tunnel rescue LIVE Updates: Timeline on how traditional manual drilling came as final help
• Workers trapped behind a 60m debris wall in the Silkyara tunnel.
• Augur machine was damaged, had to be removed by cutting
• Simultaneously, vertical drilling started from top of mountain.
• The manual horizontal drilling for the rescue started yesterday in place of augur machine.
Uttarakhand tunnel rescue LIVE Updates: This morning, CM offered prayers to local deity

Uttarakhand tunnel rescue LIVE Updates: ‘I won’t believe until I see it with my own eyes,’ says mother of a trapped worker
Mother of a worker who is trapped in the Silkyara tunnel says, "It has been 17 days since my son has been trapped. I will be happy when my son arrives I won't believe it until I see it with my own eyes..."
Uttarakhand tunnel rescue LIVE Updates: Trapped workers’ return anytime soon!
Uttarakhand tunnel rescue LIVE Updates: Garlands taken inside tunnel to welcome trapped workers
MOS Gen (retd) VK Singh and CM Dhami enter the tunnel. 41 garlands also taken inside the tunnel to welcome the workers once they come out.
Uttarakhand tunnel rescue LIVE Updates: Family members eagerly awaiting return
Family members of the trapped workers who are expected to be rescued soon from the Silkyara tunnel in Uttarkashi say, "We are happy that they will be rescued soon. We will welcome them in a nice way. We had told them that the rescue team would reach them soon."
Uttarakhand tunnel rescue LIVE Updates: Union minister General VK Singh (Retd) , CM Dhami and top officials present at the spot
Uttarakhand tunnel rescue LIVE Updates: Hospital beds made ready for trapped workers treatment
Uttarakhand tunnel rescue LIVE Updates: Thanking those involved in rescue efforts, says UP government official
"It is a matter of happiness for us. I want to thank PM Modi, the Uttarakhand administration and those involved in the rescue operation on behalf of the UP government," says Arun Mishra, coordinator of UP government for rescue operation.
Uttarakhand tunnel rescue LIVE Updates: Ambulances, disaster relief forces on alert
Uttarakhand tunnel rescue LIVE Updates: Final exit pipe laid
The rescue teams have laid the final section of exit pipe to reach 41 men trapped in a collapsed road tunnel for 17 days, officials said Tuesday.
Uttarkashi tunnel rescue LIVE Updates: Breakthrough achieved, what next?
Officials said that the evacuation process, involving pulling the workers out individually on wheeled stretchers through a 90 cm wide pipe, is expected to take a couple of hours. Before rescue workers can commence the evacuation, the pipe was pushed through, and debris is being cleared to allow them to crawl through and begin the retrieval operation.
Uttarkashi tunnel rescue LIVE Updates: 16 days ordeal to end today!
Rescue crews successfully breached the 60-meter stretch of debris in Uttarakhand's Silkyara tunnel on Tuesday in a big relief for the 41 workers who had been trapped for 16 days.
A senior official confirmed the completion of drilling.
The tunnel had been obstructed since November 12 when a section collapsed, trapping the workers inside.
Uttarkashi tunnel rescue LIVE Updates: Pipes laid to evacuate trapped labourers, updates CM Dhami
CM Dhami's tweet: As a result of the immense grace of Baba Baukh Nag Ji, prayers of crores of countrymen and the tireless work of all the rescue teams engaged in the rescue operation, the work of laying pipes in the tunnel to take out the workers has been completed. Soon all the labour brothers will be taken out.
Drilling through collapsed Silkyara tunnel over: Uttarakhand official
Uttarakhand officials tells PTI, “Drilling through collapsed Silkyara tunnel over”
‘Welding takes 1-2 hours’: MD of National Highways & Infrastructure Development Corporation Limited
Mahmood Ahmad, the MD of National Highways & Infrastructure Development Corporation Limited (NHIDCL) says, "One more pipe has to be welded today. We will then take out the muck and push the pipe in. Welding takes 1-2 hours..."

E-Paper

