MMRC sets-up disaster control room for monsoon
The Mumbai Metro Rail Corporation (MMRC) has set-up a Disaster Control Room to resolve monsoon related grievances along the 33.5-km long Colaba-Bandra-Seepz Metro-3
Published on: Jul 1, 2020, 24:03:22 IST

E-Paper


