Sign in

NHAI flags safety concerns over pipeline work on Dwarka E-way

NHAI raises safety concerns over the Dwarka expressway due to GMDA's water pipeline work, warning of potential structural threats and accidents.

Published on: Apr 4, 2026, 03:16:05 IST
Share
Share via
  • facebook
  • twitter
  • linkedin
  • whatsapp
Copy link
  • copy link

The National Highways Authority of India (NHAI) has again raised concerns about the safety of a portion of the Dwarka expressway, where the Gurugram Metropolitan Development Authority (GMDA) is laying a water pipeline between Elan Mall and the cloverleaf on NH48, an official said.

The NHAI said the pipeline-laying method has resulted in multiple distress manifestations, posing a threat to the structural integrity of the expressway. (Parveen Kumar/HT)
The NHAI said the pipeline-laying method has resulted in multiple distress manifestations, posing a threat to the structural integrity of the expressway. (Parveen Kumar/HT)

The NHAI said the pipeline-laying method has resulted in multiple distress manifestations, posing a threat to the structural integrity of the expressway.

It has sought immediate intervention to prevent any cave-in on the expressway.

Mohd Saifi, regional officer, NHAI, in a letter to GMDA on March 23, stated, “It is evident that the methodology adopted by GMDA for execution of the trenchless pipeline works does not appear to be appropriate or adequate. The same has resulted in multiple distress manifestations on the service road, thereby raising serious concerns regarding the structural integrity, long-term stability, and overall safety of the highway infrastructure.”

The NHAI warned that any sudden surface distress may potentially lead to serious accidents.

When asked about the matter, a GMDA official denied any negligence and said that almost 95% of the pipeline had been laid and that they had taken “all precautions” and “adopted safety measures” during the laying.

“Almost 95% work on laying the pipeline has been completed. The work under the main carriageway is complete, and only a small portion remains. All steps are being taken to ensure the structural safety of the road and safety of commuters,” said Abhinav Verma, executive engineer, GMDA.

The official said a pipeline was already in place, but the highway authority changed the road’s alignment, necessitating a new water pipeline.

The pipeline work began last July and is crucial for the water supply infrastructure.

  • Abhishek Behl
    ABOUT THE AUTHOR
    Abhishek Behl

    Abhishek Behl is a Special Correspondent with Hindustan Times, Gurugram bureau. With over a decade of experience in journalism, he reports on Gurugram's rapid urban transformation, covering the city's changing infrastructure, governance, and planning landscape. His reporting spans major civic agencies, such as the Gurugram Metropolitan Development Authority (GMDA), Department of Town and Country Planning (DTCP), Haryana Shahari Vikas Pradhikaran (HSVP), and the National Highways Authority of India (NHAI). Behl has reported on key urban development issues such as RRTS projects, metro expansion, road and highway projects, water supply, drainage, mobility, environmental concerns, land use planning, affordable housing, and the city's real estate sector. He closely tracks policy decisions, infrastructure implementation, and their impact on the city and its residents. He also covers regulatory action against illegal constructions, urban flooding, traffic management, and initiatives aimed at improving civic services and sustainable development. Behl has also written on political developments in south Haryana, focusing on elections and governance. His journalism is driven by fact-based reporting, ground-level coverage, and an understanding of the social and economic dynamics of Gurugram. Apart from work he is a cyclist and a cricketer and a resident of Palam Vihar since 2010.Read More