Delhi Metro plans elevated corridor project to ease South Delhi traffic: Check routes targeted, estimated cost
The proposed overhaul is expected to improve travel between South Delhi and the Badarpur border while integrating with existing Metro lines in the region.
The Delhi Metro Rail Corporation (DMRC) has drawn up an ambitious traffic decongestion plan for South Delhi, proposing a network of elevated corridors, redesigned roads, underpasses and subways along the heavily congested Mehrauli-Badarpur (MB) Road corridor.

The project is aimed at easing daily bottlenecks faced by commuters travelling through Sangam Vihar, Saket, Khanpur, Pul Prahladpur and Badarpur, areas that have seen mounting traffic pressure due to dense residential settlements, roadside parking and growing vehicle numbers.
According to officials, the proposed overhaul is expected to significantly improve travel between South Delhi and the Badarpur border while integrating with existing Metro lines and flyovers in the region.
Which routes will see improved connectivity?
The proposal includes a nearly 5-km elevated corridor connecting Sangam Vihar to Maa Anandmayee Marg through the MB Road stretch. Another 1.1-km elevated section has been planned from Pul Prahladpur towards Badarpur to streamline traffic movement near the border areas.
An elevated road from Saket G-Block to Sangam Vihar is also part of the project. Additionally, a 1.9-km stretch between Maa Anandmayee Marg and Pul Prahladpur will be redesigned to improve traffic circulation and pedestrian movement.
Officials said the alignment would connect major junctions and residential clusters including Saket G-Block, Ambedkar Nagar, Khanpur and Pul Prahladpur. A second phase also proposes a 2.48-km six-lane elevated flyover above the Delhi Metro tunnel corridor.
Estimated cost of the project
The consultancy work for preparing the detailed project report (DPR) and conducting feasibility studies has been estimated at around ₹1.47 crore. The broader infrastructure project — including elevated roads, flyovers, underpasses and redesigned road stretches — is expected to cost around ₹1,471 crore.
Timeline for completion
Officials said the DPR and feasibility study exercise for the proposed traffic revamp is expected to be completed within four months. The timeline for execution and construction of the larger project is yet to be finalised.
ABOUT THE AUTHORHT News DeskFollow the latest breaking news, major developments and agenda-setting stories from India and around the world with the newsdesk at Hindustan Times. Operating round the clock, the desk brings together experienced editors, reporters and correspondents to deliver fast, accurate and contextual reporting across subjects that influence public policy, governance, business, society and international affairs. The HT News Desk covers politics, elections, government policies, the economy, business and markets, science and technology, the environment, law and order, infrastructure, education, climate issues and geopolitics, while closely tracking developments across states, institutions and global capitals. The team also leads coverage of major breaking news events, policy announcements, court proceedings, natural disasters, public emergencies and significant international developments. Reports published by the newsdesk are based on information gathered from reporters on the ground, official statements, government agencies, court records, regulatory filings, recognised institutions and other authoritative sources. Stories undergo editorial scrutiny and verification processes to ensure accuracy, fairness and relevance, and are updated as events evolve and additional information becomes available. Whether covering a key political decision in New Delhi, an economic policy shift affecting millions, a landmark court ruling or a major global event, the HT News Desk aims to provide readers with reliable, fact-based journalism that delivers not only the latest developments but also the context and analysis needed to understand their wider implications.Read More

E-Paper


