Sign in

Excavator crashes on under-repair Dombivli rail overbridge

The bridge was dismantled last month

Updated on: May 12, 2020, 24:41:55 IST
By , Dombivli
Share
Share via
  • facebook
  • twitter
  • linkedin
  • whatsapp
Copy link
  • copy link

An excavator at work on the under-construction Dombivli rail overbridge (ROB) lost control and fell from a height of 10 feet on Monday.

The excavator lost control and fell on the road below the under-construction Dombivli rail  overbridge. (HT photo)
The excavator lost control and fell on the road below the under-construction Dombivli rail overbridge. (HT photo)

The driver sustained minor injuries. As the excavator fell on Rajaji lane below, it pulled along a slab of the bridge.

The Kalyan-Dombivli Municipal Corporation (KDMC) and the Central Railway started the repair work of the Dombivli ROB this month after the bridge was dismantled in 15 days last month.

The KDMC said incident won’t affect the repair work of the bridge.

“It was a minor accident as the excavator lost balance and crashed on the road below. The driver sustained bruises,” said Sapna Koli, city engineer, KDMC.

The bridge was shut in September 2019 after it was declared unsafe by the Indian Institute of Technology (IIT) Bombay in May 2019.

Catch every big hit, every wicket with Crickit, a one stop destination for Live Scores, Match Stats, Infographics & much more. Explore now!

Stay updated with all the Breaking News and Latest News from Mumbai. Click here for comprehensive coverage of top Cities including Bengaluru, Delhi, Hyderabad, and more across India along with Stay informed on the latest happenings in World News.