Locals decry no door pickup, waste pile up in Gurugram’s Sector 23A colony
Residents say door-to-door collection halted for six months; forced to dump waste in open or carry it to limited trolleys in the area.
Residents of Sector 23A’s economically weaker section (EWS) colony have alleged civic neglect by the Municipal Corporation of Gurugram (MCG), voicing concerns over irregular road sweeping and the lack of door-to-door garbage collection in the area.

The residents claimed that door-to-door garbage collection has been halted for the past six months, forcing them to dump garbage in open spots.
“There is no proper maintenance by the MCG. We are forced to manage garbage disposal ourselves,” said Gaurav Kumar, a local resident. “The streets are often littered with waste. We are forced to carry the waste to the few trolleys provided by the MCG or leave it in open areas. The colony and its residents have been completely neglected by the municipal authorities. Despite repeated complaints, there has been little to no action,” he claimed.
Kumar added that residents are hired to pay a private contractor for garbage collection for ₹100 a month. “But even then, the service is far from convenient. The contractor does not collect from our homes. We first have to carry our garbage to a designated collection point, and only then will it be picked up. It’s frustrating that even after paying, residents still have to struggle with disposing of their waste properly.”
Bhawani Shankar Tripathi, general secretary of the Sector 23A resident welfare association (RWA), said the lack of proper garbage collection in the area has forced residents to start disposing of their waste within the sector itself. “We already face a severe sanitation problem in the area, and this uncontrolled disposal only worsens it,” he said.
Meanwhile, ward Councillor Rakesh Yadav said waste collection was a challenge but refuted claims of irregular road sweeping. “We have been told that the door-to-door collection has been impacted as a lot of workers have left for West Bengal for elections,” he said.
A junior engineer at MCG said, “We will seek an explanation from the contractors and our teams will also inspect the affected roads, so appropriate action can be taken.”
ABOUT THE AUTHORMihika ShahMihika Shah is a Correspondent of the Gurugram bureau at the Hindustan Times, where she covers civic issues, residents' grievances, education and culture and art. She joined the Gurugram bureau in 2025, and has done her graduation from Delhi University followed by specialisation in Integrated Multimedia Journalism from the Asian College of Journalism (ACJ) in Chennai. While growing up, Mihika always aspired to be a journalist. She believes that journalism demands both passion and compassion. She thrives on breaking exclusive stories and covering issues which are often overlooked. Through her on-ground reporting, she seeks to understand Gurugram as a city beyond its high-rises and glass towers. She believes the best stories emerge from persistent reporting and looking beyond the obvious. Her reporting focuses on issues that directly impact everyday life, with an emphasis on public infrastructure and community concerns. She strives to bring observational depth to her reportage. She also manages the weekly column called Concern for Gurugram, which is published every Wednesday. She is a team player who values open communication and ideas. Her native place is Uttarakhand and her connection to mountains also draws her to stories on the environment. Beyond news reporting, Mihika loves talking and writing about cinema and pop culture. She also likes to travel and explore new places and cuisine.Read More
Stay updated with all top Cities including, Bengaluru, Delhi, Mumbai and more across India. Stay informed on the latest happenings in World News along with Delhi Election 2025 and Delhi Election Result 2025 Live, New Delhi Election Result Live, Kalkaji Election Result Live at Hindustan Times.

E-Paper


